Ceridwen and Shiny Petrified Slice
This piece was cut and polished at a granite works in Barre, VT. It took about 18 hours to cut through the log on equipment that could make it through a comprable piece of granite in about 2.5 hours.

Index      Previous      Next

Previous photo Next photo Thumbnail page

DATE: 9/27/05 2:44 PM   |  

Order printing and delivery of this image Order prints


Generated by JAlbum 5.2   Design inspired by Exhibit Engine
   
Index      Previous      Next